  1. General CNC processing usually refers to precision machinery processing, CNC processing lathes, CNC processing milling machines, and CNC processing scalp and milling machines.
    1. CNC lathe is processed by the processing route to start the car knife starting from the pairing point (or the original point of the machine to the original point), until the path that is returned to the point and ending the processing program Cut out of the non -cut -cut itinerary path.
    2. The feed route of fine processing is basically based on the outline of its parts. The focus of determining the work of the feed route is to determine the feed route of rough processing and air stroke.
    3. In the processing of CNC lathes, the determination of the processing route should generally follow the following principles, and the accuracy and surface roughness of the processing workpiece should be ensured.
    4. Most processing routes, reducing air schedule, improving processing efficiency, simplifying the workload of numerical calculations, simplifying processing procedures, and using sub -programs for reused procedures.
    5.cnc index control machine tools are programmed by CNC processing language, usually G code. CNC processing G code language tells what kind of Descartes position coordinates are used for the processing tools of CNC machine tools, and the feed speed and spindle speed of the tools are controlled, as well as tool transformers, coolants and other functions.

  2. /watch? v = QQX47GO_3iy Original Video: YouTube @Galcotv

    n00:00 / 03: 4770% shortcut keys to describe space: Play / suspend ESC: exit full screen ↑: increase volume 10% ↓: reduced volume decrease by 10% →: single fast forward 5 seconds ←: single fast retreat 5 seconds Press hold down and hold it holding up. Here you can drag no longer appear in the player settings to reopen the small window shortcut key description

  3. 1. After each operator receives the program form, be sure to see the workpiece name, number, material, workpiece embryo, the method of the installation method of the workpiece, the direction of the workpiece, etc. Avoid the wrong
    2 2 before the requirements of the program sign. Before the workpiece is placed, the burrs around the workpiece should be cleaned up before the workpiece can be cleaned before you can go to the machine. The horizontal degree of X, Y, and Z should be dragged separately, and the error should be controlled within 2 silk. After the school table is divided into a good, it must be repeatedly checked once to confirm it. R n 4, the knife must be used to measure the tool with a caliper to ensure accurate accuracy. For fine light (30r5, 20R5, 20R0.8, 16R0.8, 12R0.8), the diameter of the diameter of the diameter of the diameter of the tool seeing the knife method for the diameter of the diameter of the diameter for the diameter When using a 1 ~ 10mm knife, the metering error must be within 1 to 2 silk
    5. Before transmitting each program to the machine tool processing, the relevant software should be used to check the knife road. The knife tool should be used. The size, whether the length of the knife is consistent with the program, can be transmitted before confirming. For each precision processing program, the main shaft should be kept at high speed before starting processing for 10-15 minutes
    6, and when starting the process of starting the knife, You should check whether there are unrelated data in the G60. If so, you must clean up before processing. When the tool is about to cut into the workpiece, you should check whether the residual value is consistent with the height of the knife. n 7. During the processing process, you must adhere to the post and do not stay away from the machine tool. When it is thick to the middle, you must observe the processing status of the tool. If the blade is damaged, replace it in time. Contact the programmers to change the program. After the thickness is turned on, the workpiece should be replaced once again to check whether there is a movement position.
    8, ensure the rational matching of the tool speed and the feed rate of the machine tool during processing. At the beginning, you must pay attention to observing whether the surface of the workpiece is sufficient before continuing processing.
    10. After the processing is completed, you should know that the programmist should be checked. sign.