What to do with Shandong Electric Power Engineering Qualification?

What to do with Shandong Electric Power Engineering Qualification? how much is it?

2 thoughts on “What to do with Shandong Electric Power Engineering Qualification?”

  1. Before the power of power construction, it depends on whether the conditions are met.
    Himi Ming Jingzhi to organize the requirements required by the requirements of the qualifications as follows:
    . In accordance with national regulations, institutions established in accordance with national regulations; Legal entity;
    . There are fixed workplaces and computers, instruments, instruments and other equipment required to engage in communication engineering construction supervision;
    . The qualification level standards that meet the application for communication construction supervision enterprises applied for.
    The general processes of qualifications are as follows:
    (1) The applicant will apply to the Provincial Department of Construction and submit relevant materials. Among them, the enterprise managed by the central government directly applies to the Ministry of Construction;
    (2) The Provincial Department of Construction conducts a preliminary examination of the application materials for the application of the enterprise to apply for qualifications;
    (3) (Including no grade qualifications) and the application materials for labor subcontracting qualifications; if the qualifications involved in transportation, water conservancy, communication, electronics, etc., the Provincial Department of Construction obtains the approval of the relevant departments at the same level; n (4) The permission is allowed to issue and deliver the qualification certificate to the applicant during the legal time (20 working days).
    The qualifications to find Nanjing Runli Finance.

Leave a Comment